Ground Conditions
- Suitable for flat or sloping ground and any hard or soft surface.
- Not recommended for sites prone to regular deep water flooding.
- Areas with a high water table may experience slower water dispersion.
DIY Installation
- Excavation depth: 1160mm (includes 150mm for drainage).
- 1010mm deep Galvanised steel socket.
- Tools required - CAT scanner, stone cutting saw, concrete breaker, post borer, long-arm graft, shovel, spirit level, trowel, hand tools, and a wheelbarrow.
- Materials required - 20mm shingle, 10mm shingle, ballast, sharp sand, rapid set cement, cement dye (optional), mortar plasticiser, and water.
- Approx time to install - 1-2 hours (per bollard).
- DIY installation guide (PDF)
We can install this telescopic bollard for £230 + vat (£276.00 inc vat).
- Price applies to the installation of a single bollard and includes the all-important cable avoidance scan (CAT scan), road tolls, fuel, alignment, excavation, installation, materials, surface reinstatement, and spoil removal from the site.
- Your installer's vehicle is fully equipped and will carry the necessary tools to complete the work. Your installer will also provide their own electricity and water supply.
- Discounts are available for multiple installations at the same location (see our 'Buy More - Save More' rates above).
- More details about our installation service
Ordering your installation(s)
-
To have one of our experienced, fully insured operatives install your bollard(s) simply 'ADD INSTALLATION' to your order.
-
You will then be allocated an installer, and your goods will be manufactured and delivered to you within the estimated delivery date shown above.
- Once you receive your goods, simply contact your allocated installer to arrange an installation date that we guarantee will be carried out within the estimated installation date shown above.
- The postcode areas we cover